Olympic Pavilion C, completed

Once again, FERMA assumes important participation in projects of great importance, such as carrying out the manufacture and assembly of the Olympic Pavilion C, which inside it, an Olympic pool was built, unique in the country and built under rigorous standards. of the Olympic Committee, which will be one of the main stages of the Youth Olympic Games.

The metal structure weighed around 700 TT, and the assembly of it, was carried out with a 600 TT crane from the outside of the ship «.